Calendar of Events

May 21, 2013 to May 22, 2013 | Washington, DC
May 21, 2013 to May 22, 2013 | Charlotte, North Carolina
May 21, 2013 to May 23, 2013 | Atlanta, GA

Keywords

Public Utilities Reports

PUR Guide 2012 Fully Updated Version

Available NOW!
PUR Guide

This comprehensive self-study certification course is designed to teach the novice or pro everything they need to understand and succeed in every phase of the public utilities business.

Order Now

American Electric Power Service

Greenhouse Chill

Has the Supreme Court frozen climate change litigation?

Wansheng Jerry Liu and David Restaino

The Supreme Court’s decision in American Electric Power v. Connecticut strongly limits private nuisance actions against greenhouse gas (GHG) emitters by keeping these cases out of federal court. But the AEP decision won’t stop lawmakers from enacting new GHG regulations, and it won’t prevent plaintiffs from suing emitters in state courts.

A Subtle but Clear Preference for ISOs

Jeremiah D. Lambert

Do not mistake the FERC's professed neutrality on what works best for regional transmission organizations.

In its final rule on regional transmission organizations, known as Order 2000,[Fn.1] the Federal Energy Regulatory Commission said it would not dictate to the electric utility industry whether and how to form RTOs. Don't be misled. The FERC claims to be agnostic,[Fn.2] but it still has a vision. And that vision leads inexorably to one conclusion. The preferred form for an RTO is the independent system operator, or ISO.

FERC's Mandatory Gas Auctions: Are We Bidding the Right Product?

Mark Lively

Auctioning gas imbalances offers advantages over bidding on available pipeline capacity.

In a Notice of Proposed Rulemaking issued last summer, the Federal Energy Regulatory Commission proposed a series of auctions for all unutilized short-term rights in pipeline capacity, with the most frequent auction being for transmission rights for the next day. All transporters and the pipeline would be required to release available short-term capacity rights to be auctioned. (See FERC Docket RM98-10-000, Regulation of Short-term Nat. Gas Transp.

Perspective

Mark Lively

DURING THE WEEK OF June 22 there was a major imbalance between supply and demand for electricity in the Midwest. Although demand was high enough to set a few records, the real problem may have been the lack of supply. Many generators were out of service and a few marketers reneged on contracts to deliver power. Market prices for bulk power allegedly soared as high as $4,000 per megawatt-hour. The industry was left in an uproar over these volatile prices, especially since a competitive market has been touted as a means to achieve lower prices, not higher ones.

Far From Closure: No Consensus Yet on Accounting Proposal for Decommissioning

John S. Ferguson

In aiming to make financial statements more meaningful, will FASB instead make them indecipherable?

By mid-summer, a total of 123 companies had cranked out some 574 pages of comments, detailing exactly what they thought of the accounting rules proposed by the Financial Accounting Standards Board to cover the closure or removal of certain long-lived assets. %n1%n The FASB's"Exposure Draft," issued early last year, had requested comments on eight issues. The respondents answered as requested, but also raised a host of new questions.

ISO Pricing: Let's Not Socialize Transmission Rates

Mark J. Vople

Flow-based pricing ends

subsidies inherent in grid-wide,

postage-stamp rates.

I

n Order 888, the Federal Energy Regulatory Commission suggested 11 principles for forming an independent system operator, or ISO. In its third principle, the FERC offered this guidance on transmission pricing:

An ISO should provide open access to the transmission system and all services under its control at non-pancaked rates pursuant to a single, unbundled, grid-wide tariff that applies to all eligible users in a non-discriminatory manner.

Special Report Developing Competitive Power Markets: The Planning Stages

Lori A. Burkhart

A special report

on transmission,

power pools, ISOs,

and the fallout from FERC Order 888."WHAT IS NEW IN THE INDUSTRY IS

not the conclusion that coordination in operations is needed to avoid chaos.

NOPR Tariff Formulas Breed Discontent

Lori A. Burkhart

The Federal Energy Regulatory Commission (FERC) has denied rehearing of an order authorizing Duke Energy Marketing Corp. and two affiliates, Duke Energy Marketing Corp. and Duke/Louis Dreyfus L.L.C., to sell power at market-based rates (Docket Nos. ER95-755-001, et al.).

Comparability: Lost in the Clouds

Wallace Edward Brand

In the consolidated case involving American Electric Power Service Corp., the Federal Energy Regulatory Commission (FERC) reiterated its new rule on comparability, instructing the parties to address the "different uses that a transmission owner makes of its transmission system" and to offer comparable use to others, without impediments, at

a comparable cost. But what, exactly, are those "different uses"?

FERC to Flesh Out Comparability

Lori A. Burkhart

The Federal Energy Regulatory Commission (FERC) has set for hearing issues related to a proposed, open-access transmission tariff for point-to-point service in Citizens Utilities Co.'s (CU) Arizona service territory. It also approved CU's agreement requiring a transmission customer, Aha Macav Power Systems, Inc., to pay a $190,000 contribution in aid of construction (CIAC) to interconnect to CU's grid (Docket No.

Pages