The Queue Quandary

Why developers today are often kept waiting to get projects ok’d to connect to the grid.

Bruce W. Radford

Late last year FERC learned that the Midwest regional grid likely would require at least 40 years — until 2050 — simply to clear its backlog of proposed gen projects awaiting a completed interconnection agreement to certify their compatibility with the interstate power grid. But grid engineers would meet that date only by shortening the process and studying multiple projects simultaneously in clusters. To apply the process literally, studying one project at a time, as envisioned by current rules, the Midwest reportedly would need 300-plus years to clear its project queue.

Demand-Side Dreams

FERC would relax price caps—sending rates skyward—to encourage customers to curtail loads.

Bruce W. Radford

About four months ago, at a conference at Stanford University’s Center for International Development, the economist and utility industry expert Frank Wolak turned heads with a not-so-new but very outrageous idea.

PJM Addresses Local Supply Issues

Electric shortages and the generation overbuild continue to co-exist.

Hind Farag

While maintaining its stance as the most sophisticated competitive electricity market in the country, PJM still faces several challenges, all of which are augmented by its expanded footprint. Most prominent is the RTO’s plan to implement a new reliability pricing model. Further, parts of PJM are ailing from transmission congestion issues that limit access to abundant, cheap power sources in the region.

Letters to the Editor

Jay Kumar, President, Economic & Technical Consultants Inc.: Could Hind Farag and Gary L. Hunt point out any winner whose power costs have decreased after the implementation of LMP? I can bet they won’t find even one single (real) entity. ... I am glad that MISO is sticking to the original basis of a supposedly competitive market.

Diane Moody, Director, Statistical Analysis, American Public Power Association: “The Fallacy of High Prices” purports to show that restructuring of wholesale power markets has resulted in significant benefits. However, the analysis it offers in support of this proposition is not credible.

How Needed Is NERC?

Critics say its new budget and business plan could simply duplicate the work of RTOs.

Bruce W. Radford

FERC granted formal certification to NERC as the nation’s sole ERO and reliability czar, making it inevitable that NERC would delegate the job of regional enforcement to its various regional reliability councils, already constituted. To understand why FERC acted as it did, turn back the clock nearly a decade.

The Nation's Grid Chiefs: On The Future of Markets

Exclusive interviews with the CEOs of five regional transmission systems.

By Bruce W. Radford

Exclusive interviews with CEOs at five regional independent transmission system operators: Phil Harris, at PJM; Gordon van Welie, at ISO New England; Yakout Monsour, at the California ISO; Graham Edwards, at MISO; and Mark Lynch, at the New York ISO.

One RTO, Two Systems

By trying to placate regulated states—letting utilities “opt out” from its capacity market—PJM finds its RPM idea under fire.

Bruce W. Radford

While the PJM Interconnection has made no major changes to its prototype capacity market since it proposed the idea a year ago in August, and though it has won a tacit OK from federal regulators for many of the plan’s key elements, don’t expect to see a slam dunk when the time comes for a final review of the controversial idea, known as the Reliability Pricing Model.

Kicked Off and On Schedule

Cal-ISO files a new market design, but has it traded efficiency for software?

Bruce W. Radford

Eyeing a launch date of November 2007, Cal-ISO at last has come forward with plans for revamping its widely disparaged wholesale market design. The formal proposal, known as the MRTU (Market Redesign and Technology Upgrade), was filed this past February at FERC.

In the Mainstream: Wind Turbines Take Off

New technologies are helping windpower mature as a viable power supply choice for utilities.

Michael T. Burr

Few people understand how to ride shifting winds better than Jim Dehlsen does. Dehlsen founded Zond Energy Systems 25 years ago, and steered the company through a series of major changes and challenges—the oil-price collapse of the 1980s; ambivalent energy policies, with on-again, off-again production tax credits; and the sale of controlling interests in Zond to Enron in the late 1990s. Should it come as any surprise, then, that Dehlsen still is bullish on windpower’s prospects?

Barriers to Transmission Superhighways

History teaches us that the most successful American businesses emerge from the crucible of competition.

Ed Krapels

Important challenges still confront the development of a coherent strategy to create an efficient modern transmission system. Assuming FERC and Congress are earnest about creating a 21st century grid, new ideas, projects, and technologies need to emerge.

Pages