San Diego Gas & Electric

Study Calls Muni Trend "Traditional"

Coopers & Lybrand has released its 1996 Electric Municipalization Review, which examines the two municipalizations completed since the Energy Policy Act of 1992: Broken Bow, OK, and Bozrah, CT.

Broken Bow, which began operating in 1995, serves the new six-megawatt (Mw) load of one industrial customer and owns no electric facilities; Public Service Co. of Oklahoma serves town residents. The Town of Bozrah had been served by a privately held corporation, Bozrah Light & Power (BL&P), whose owner was retiring and wanted to sell.

California IOUs Draft FERC Filings

The three largest California investor-owned utilities (IOUs) (em Pacific Gas and Electric Co., San Diego Gas & Electric Co. (SDGE), and Southern California Edison Co. (SCE) have circulated for comment working drafts of future Federal Energy Regulatory Commission (FERC) filings concerning a deregulated electricity industry.

One 150-page proposal asks that operational dispatch control of transmission facilities be conveyed to an ISO, beginning January 1, 1998.

Joules

CMS Generation Co., a unit of CMS Energy Corp., has begun operating the 35-Mw, waste-wood-fueled, independent Genesee Power Station near Flint, MI. CMS Generation will sell the electricity to Consumers Power Co. under a long-term contract. Half the plant is owned by CMS, half by Black & Veatch Development Corp. and Genesee Power Co.

Another unit of CMS Energy, CMS Gas and Electric Marketing, has signed an agreement with Marine Coal Sales Co. of Indianapolis, IN, to market electricity, coal, and natural gas in the east central United States.

S&P Wary of CPUC Restructuring

Standard & Poor's (S&P) plans to maintain negative outlooks on the three largest California electric utilities (em Southern California Edison (SCE), San Diego Gas & Electric (SDG&E), and Pacific Gas & Electric (PG&E). Although it considers the California Public Utilities Commission's (CPUC's) December 20 electric restructuring order "reasonably favorable," S&P will not reexamine the ratings until it is sure the plan will be finalized as proposed. S&P's concern is that some members of the California State Senate believe small customer interests would not be adequately protected.

Frontlines

You've heard talk lately about the convergence of electricity and natural gas. That idea has grown as commodity markets have matured for gas and emerged for bulk power.

But some economists take a different view. They see the real convergence occurring between electricity and telecommunications. I'm not talking about the "smart house" or fiber-to-the-whatever. Instead, how is the product is created?

Frontlines

Mark your calendars for April 29, 1996. That's the date of the "filing of the century," according to Donald Garber, group manager for strategic plans and projects at San Diego Gas & Electric Co.

Garber is talking about plans to file a draft operating agreement at the Federal Energy Regulatory Commission (FERC) for the proposed California Power Exchange. The April filing will mark an important step in executing the December 20 order by the California Public Utilities Commission (CPUC).

FERC's Mega-NOPR: The IOUs Respond

It comes as no surprise that regulated investor-owned utilities (IOUs) hold divergent views on the restructuring of the electric industry. Size, generation cost, transmission access, customer loyalty, and the friendliness of state regulators all factor into their individual visions of restructuring.