Commission

Paying for the Green Grid

Subsidies might not be the best solution for interconnecting renewables.

Supporters of renewable energy are seeking to socialize the cost of a new interstate highway system for transporting green power. But utilities and transmission owners will build or finance new transmission systems to serve economic demands. Policy makers shouldn’t pre-ordain the direction of industry progress.

Compliance Program Guidance

The industry debates how far FERC should go.

Since the Energy Policy Act was enacted in 2005, the domestic power and gas industry has experienced several years of FERC compliance enforcement history. Including the settlements entered into in 2007, total penalties levied and agreed to by companies are close to $100 million over the past two years. Given the high stakes, some industry stakeholders have suggested that FERC could provide more comprehensive guidance on what it means to have an adequate compliance program and what constitutes that compliance.

Carbon and the Constitution

State GHG policies confront federal roadblocks.

So far, states have taken the lead in carbon-control strategies. These state actions, however, could lead to constitutional conflicts—as recent court battles demonstrate. Only the U.S. Congress can regulate interstate trade, so states must step carefully in controlling carbon leakage.

Making Efficiency Cool

A new business plan for capturing big saving.

Historically, conservation has suffered from a fundamental challenge: it’s boring. But as efficiency becomes the first fuel, providers of efficiency services will begin to look more like businesses and less like government agencies—characterized by dynamic branding, with marketing strategies driven by customer science.

Federalizing the Grid

Renewable mandates will shift power to FERC but pose problems for RTOs.

A recent survey conducted by the U.S Office of Personnel Management and reported by the Washington Post on March 13 ranked the Federal Energy Regulatory Commission as eighth best of some 37 federal agencies in terms “talent,” and third in “leadership and knowledge.”

Saving Depreciation Accounting

Avoiding ‘earnings management’ requires transparency in reporting standards.

The SEC is taking steps toward substituting International Financial Reporting Standards for U.S. Generally Accepted Accounting Principles. Having certainty surrounding existing utility asset and depreciation accounting practices enhances the ability to use financial statements to accurately depict the results of operations and financial status of reporting entities.

Stabilizing California's Demand

The real reasons behind the state’s energy savings.

In 2006, the California legislature and governor positioned energy conservation and efficiency as the cornerstone of the state’s Global Warming Solutions Act. The Act mandates a 2020 statewide limit on greenhouse gas (GHG) emissions to 1990 levels. Compliance will be nothing short of Herculean: California will have to reduce per capita energy usage in a manner that accommodates continued brisk population growth and protects the state’s economy from economic dislocations and recessionary pressures.

Five Nuclear Challenges

Building reactors requires new federal commitment.

Several key barriers prevent the construction of a new U.S. nuclear power fleet. These barriers must be overcome to prevent a power-shortfall emergency.

Rethinking 'Dumb' Rates

Achieving the smart grid’s potential requires a revolution in electricity pricing.

Achieving the smart grid’s potential requires a revolution in electricity pricing. Smart metering and smart rates might yield surprising and beneficial changes in the U.S. utility industry. But capturing those benefits will require an intelligent and careful approach to implementing dynamic pricing.

Transition to Dynamic Pricing

A step-by-step approach to intelligent rate design.

The advent of the smart grid is sparking interest in intelligent rate design. But while state and federal goals encourage more efficient rate structures, regulatory and political considerations complicate the process. Getting to a next-generation rate design will require a phased transition.