When you sell demand response back to the grid, how much capacity are you now not buying?
When customers sell demand response into a regional capacity market (such as PJM’s Reliability Pricing Model, known as the RPM), how much credit should they earn for agreeing to curtail demand and alleviating stress on the grid — that is, for reducing the market’s need for generating capability and capacity reserve margin? And further, should the amount of credit depend on whether the customer works with market aggregators, known both as CSPs (“Curtailment Service Providers”) or ARCs (“Aggregators of Retail Customers”)? One view would pay customers for the full extent of their curtailment of demand — known as its “Guaranteed Load Drop” (GLD). The other would limit capacity credit to the customer’s prior load history — “Peak Load Contribution,” or PLC. The answer may well dictate whether regulators continue to treat “energy” and “capacity” as two distinct concepts.
In the Pacific Northwest, you either spill water or spill wind.
The wind power industry has been up in arms ever since the Bonneville Power Administration earlier this year announced its Interim Environmental Redispatch and Negative Pricing Policy. That policy, applicable during periods of high spring runoff and heavy water flow volumes on the Federal Columbia River Power System, calls for BPA to redispatch and curtail access to transmission for wind power generating turbines, and to replace that resource with hydroelectric power generated via BOA hydroelectric dams, in order to avoid having to divert water through dam spillways, which could threaten fish and wildlife by creating excess levels of Total Dissolved Gas (TDG), which can cause Gas Bubble Trauma. Yet the legal issue remains unclear: Does this practice imply discrimination in the provision of transmission service, or is it simply a matter of system balancing and generation dispatch? In fact, the FERC may lack jurisdiction over the dispute, as it pertains to the fulfillment of BPA’s statutory mandates.
Does slow and steady still win the race?
Michael T. Burr, Editor-in-Chief
When a capital-intensive industry enters an asset-building cycle, many companies will operate in the red for a few years or more. That’s not necessarily a bad thing, as cap-ex investments represent growth for shareholders. The devil is in the details, however, and companies facing a large slug of environmental compliance investments might produce disappointing returns over the next few years.
(August 2011) Shaw Group completes 500 MW combined cycle plant; Pattern Energy begins building Spring Valley wind farm; AEP, Duke and TVA team up on interstate transmission line; AEP and MidAmerican contract for Texas transmission projects; Alliant contracts Open Systems International for volt-VAR control system; Alstom buys into AWS Ocean Energy; Siemens acquires shares in PV manufacturer Semprius; Lockheed Martin introduces cyber security system; plus contracts and announcements involving Elster, Itron, Suzlon, Solon, Sensus, Westinghouse Electric, Morgan Lewis and others.
Protecting the smart grid requires a broader strategy.
NERC’s critical infrastructure protection (CIP) standards set a minimum level of security performance—and only for high-voltage transmission systems, not the distribution grid. A compliance-checklist approach to security might lack the adaptability needed to combat evolving threats like the Stuxnet worm. A multi-layered, risk-based approach will provide better protection for the emerging smart grid.
Shaping system transformation.
New technologies—and new expectations—require taking a fresh look at the institutions and practices that have provided reliable electricity for the past century. Collective action is needed to define the key attributes of a future grid and then to take the more difficult next step—adapting our processes and institutions to align with that future vision. A thoughtful approach will allow America to capture the potential value that’s offered by sweeping changes in technologies and policies.
But transmission planning, as we know it, may never be the same.
The recent landmark ruling on transmission planning cost allocation, known as “Order 1000,” and issued by the U.S. Federal Energy Regulatory Commission in late July 2011, could well produce an unintended side effect — the formation of regional compacts among states to identify needs and plan for development of new power plant projects.
(August 2011) Economic consultant Michael Rosenzweig challenges Constantine Gonatas’s proposal for ensuring FERC’s demand response rulemaking achieves its objectives. Also, Juliet Shavit takes issue with Contributing Editor Steven Andersen’s characterization of utility customers as “crazy.”
Protecting critical assets in a hazardous world.
In the wake of recent global-scale cyber intrusions, security concerns have expanded from being compliance and operational issues to fundamental risk management considerations. An integrated, enterprise-wide approach holds the greatest promise for securing critical utility infrastructure against increasing dangers in cyberspace.
Out of market means out of luck—even for self-supply.
When the U.S. Federal Energy Regulatory Commission issued its so-called ”MOPR“ decision in April 2011, approving a minimum offer price rule (or bid floor) for PJM RPM capacity market — and then on the very next day did much the same for New England’s FCM capacity market — FERC did more than just prop up prices. Instead, it created a nightmare scenario for utilities that still own their own generation. These utilities, who choose to “self-supply” with their own plants, rather than buy capacity from either the RPM or FCM, adequacy rules, could now be forced to pay twice for capacity — if their own plants are deemed inefficient or uneconomic.
Pages