Calendar of Events

May 21, 2013 to May 22, 2013 | Washington, DC
May 21, 2013 to May 22, 2013 | Charlotte, North Carolina
May 21, 2013 to May 23, 2013 | Atlanta, GA

Keywords

Public Utilities Reports

PUR Guide 2012 Fully Updated Version

Available NOW!
PUR Guide

This comprehensive self-study certification course is designed to teach the novice or pro everything they need to understand and succeed in every phase of the public utilities business.

Order Now

Joseph Welch

Federalizing the Grid

Renewable mandates will shift power to FERC but pose problems for RTOs.

Bruce W. Radford

A recent survey conducted by the U.S Office of Personnel Management and reported by the Washington Post on March 13 ranked the Federal Energy Regulatory Commission as eighth best of some 37 federal agencies in terms “talent,” and third in “leadership and knowledge.”

Titans of Transmission

ITC and AEP jockey for the lead in building the grid of tomorrow.

Bruce W. Radford

On February 9, a group of the nation’s major grid system operators released a study estimating the nation’s electric industry sector needs to spend some $80 billion—more than 10 times the size of that portion of the Obama stimulus package directed specifically at transmission construction—in order to achieve a 20 percent retail penetration for renewable wind energy in just the Eastern Interconnection.

A Gas Crisis, or Not?

The conclusions made by the NPC gas study raise more questions than they answer.
Ken Costello

The conclusions made by the NPC gas study raise more questions than they answer.

In late September of 2003, the National Petroleum Council (NPC) issued a comprehensive study on the future of the U.S. natural gas industry.1

MISO: Building The Perfect Beast

Seams, holes, and historic precedent challenge the Midwest ISO's evolution.
Michael T. Burr

Seams, holes, and historic precedent challenge the Midwest ISO's evolution.

In a single sentence, Bill Smith of the Organization of MISO States (OMS) summarizes prevailing concerns about the new-and-improved Midwest ISO: "When it starts, it has to work."