Order 888

News Digest

TELCO UNIVERSAL SERVICE FUND. Reversing an appeals court, the Kansas Supreme Court upheld a decision by the Kansas Corporation Commission that had required wireless telecommunications carriers to contribute to the state's universal service fund. It also affirmed a KCC ruling setting the initial amount of the fund in a roundabout way based on equalizing inter- and intrastate long-distance rates.

The KCC order (issued Dec. 27, 1996) had slashed intrastate toll rates by $111 million over three years. It then cut access charges by an equal amount to offset the loss to toll carriers.

Electric Reliability Sanctions or Commerce?

EARLIER IN THIS DECADE, FERC CHAIRMAN MARTIN ALLDAY delivered his famous quote: "Everybody is somebody's native load customer."

Today, that truism has fallen under attack. It could go out the window if power marketers get their wish. One group of marketers has asked the Federal Energy Regulatory Commission to open a new rulemaking on electric system reliability. This group proposes to end the notion of transmission responding to load.

Perspective

AMERICANS ARE fascinated with lists. There are lists of just about anything you can name, from the Fortune 500 to baseball batting averages. There's even a book of lists. We especially like to rank "top tens," like the 10 best cities to live in or the 10 worst school districts in America. Television has popularized these lists.

Frontlines

ATTENDED ANY HEARINGS LATELY AT THE FEDERAL ENERGY Regulatory Commission? They're getting ugly. I see a federal agency under siege (em from without and from within.

The Commission seems to have lost the easy confidence that reigned during Elizabeth Moler's tenure. Don't blame new Chairman James Hoecker. He's getting it from all sides, and it's not his fault.

Consider the bottomless pit known as electric system "reliability." We need new laws to pin down FERC authority.

News Analysis

In an ideal world, legislation would have already happened."

That was Elizabeth Moler, deputy secretary of energy, testifying as the first witness at a Feb. 20 public conference at the Federal Energy Regulatory Commission. The forum attempted to address how to ensure access to transmission as the electric industry builds a new framework to maintain system reliability.

Having just stepped down from the top spot at the FERC, Moler knew what to expect. She understood the limits of the FERC's statutory authority and its budget.

News Digest

State Legislatures

CALIFORNIA ELECTRIC RESTRUCTURING. California Assemblywoman Diane Martinez, chairwoman of the Utilities and Commerce Committee, has introduced two new bills aimed at protecting consumers in a competitive market. But the measures already have been put on hold for this year. The first bill, AB 579, would cut rates for residential and small-volume commercial customers by 20 percent, rather than by 10 percent as promised in the state's restructuring act, AB 1890.

Power Pools & ISOs: Monitoring Market Power in a Restructured Industry

THE CALIFORNIA DEBATE OVER ELECTRIC RESTRUCTURING IS now nearly four years old. And though it is nearing its final stages (the opening is now set for March 31), some of the most important questions as to how this will work in practice are just emerging.

The original bargain had called for the state's three large investor-owned utilities to vest basic control of their transmission networks in the new independent system operator in exchange for maintaining combined ownership of generation and transmission assets (and for a good level of assured stranded cost recovery).

California's Scheduling Coordinator: Market-Maker with Advantage

AFTER A FOUR-YEAR DEBATE ON ELECTRICITY REFORM, CALIfornia's powerful industry players have carved out a unique and broad new role for "scheduling coordinators." SCs have the central role in offering fully unbundled generation, transmission and retail-access services. But could these SCs, by controlling the market, also become the new monopolists?

California's highly complex scheme for markets, while said to be laissez faire, maintains several artificial constraints and market protocols that create advantages for SCs.

Cutting Electricity Costs for Industrial Plants in a Real-Time World

AS U.S. ELECTRICITY MARKETS BECOME increasingly competitive, large industrial customers will discover many new choices. These choices include the opportunity to modify the amount and timing of electricity use in response to prices that vary from hour to hour. In addition, customers can sell certain electricity services, including operating reserves and load following, to the system operator. And industrial customers with cogeneration facilities can participate fully in bulk power markets, buying and selling energy and ancillary services in response to changes in spot prices.

FERC Briefs

CINERGY MERGER CONDITIONS. FERC allows two-year deferral of prior requirement (a condition of the 1993 Cinergy merger) for Cincinnati Gas & Electric Co. and PSI Energy Co. to build a 345-kV transmission line by 2000 to link territories to guarantee central dispatch for generation. Cinergy says it can now duplicate the capacity with open access. FERC Chair James Hoecker concurs, citing "further evidence that the bulk power market is working." (Docket No. EC93- 6-004, Sept. 24, 1997)

Hydro Licensing.