Pacific Northwest

Bourne Energy Break the Energy Barrier

Bourne Energy successfully field-tested the latest version of its BackPack Power Plant (BPP) portable hydropower system in a shallow remote river in the Pacific Northwest. A zero-fuel power generator of this size (one cubic meter) producing 600 W will help renewable energy move past the low energy density, low capacity factor and high cost barriers that have slowed the growth of renewable energy.

The Trouble with Freeriders

The debate about freeridership in energy efficiency isn’t wrong, but it is wrongheaded.

In any conservation or efficiency program, some market participants will reap benefits without paying their share of the costs—i.e., the “freerider” problem. Some freeriders are unavoidable and generally not a problem. But as Cadmus Group analysts Hossein Haeri and M. Sami Khawaja explain, avoiding excessive freeridership requires careful program structuring, as well as ongoing measurement to accurately evaluate outcomes.

Not-So-Green Superhighway

Unforeseen consequences of dedicated renewable energy transmission.

Achieving aggressive renewable energy goals will require building thousands of miles of new transmission lines, and these so-called “green-power superhighways” could bring major new sources of low-cost electricity into the market. But will those sources be renewables? Analysts Roger Bezdek and Robert Wendling argue that with new access to distant wholesale markets, coal-fired generation would become more competitive than ever.

Frequency Regulation

In a recent order, the Federal Energy Regulatory Commission (FERC) said that by paying the wrong price for the ancillary service known as frequency “regulation,” system operators have encouraged too many gas-fired turbines and other conventional fossil power plants to supply regulation service.

Putting market economics ahead of reliability, the Federal Energy Regulatory Commission (FERC) has told regional transmission organizations (RTOs) and other grid system operators (ISOs) to rethink the prices they pay for the ancillary service known as frequency “regulation.”

In short, FERC wants all power plants to do what they do best — recognizing that some may be well adapted to providing regulation service, but others perhaps not.

Vendor Neutral

(October 2011) Wind Capital group selects RMT Inc. to design and construct wind energy facility; MEMC Electronic Materials, Inc. and SunEdison acquire Fotowatio Renewable Ventures; Solar Community and Reliant Energy team up to offer financing options; KEMA selects Green Energy Corp.’s software; Leviton unveils commercial electric vehicle charging stations; plus announcements and contracts involving Science Applications International Corp., Tantalus, FirstEnergy Nuclear Operating Co. and others.

Bonneville's Balancing Act

In the Pacific Northwest, you either spill water or spill wind.

The wind power industry has been up in arms ever since the Bonneville Power Administration earlier this year announced its Interim Environmental Redispatch and Negative Pricing Policy. That policy, applicable during periods of high spring runoff and heavy water flow volumes on the Federal Columbia River Power System, calls for BPA to redispatch and curtail access to transmission for wind power generating turbines, and to replace that resource with hydroelectric power generated via BOA hydroelectric dams, in order to avoid having to divert water through dam spillways, which could threaten fish and wildlife by creating excess levels of Total Dissolved Gas (TDG), which can cause Gas Bubble Trauma. Yet the legal issue remains unclear: Does this practice imply discrimination in the provision of transmission service, or is it simply a matter of system balancing and generation dispatch? In fact, the FERC may lack jurisdiction over the dispute, as it pertains to the fulfillment of BPA’s statutory mandates.

Grid 2050

Shaping system transformation.

New technologies—and new expectations—require taking a fresh look at the institutions and practices that have provided reliable electricity for the past century. Collective action is needed to define the key attributes of a future grid and then to take the more difficult next step—adapting our processes and institutions to align with that future vision. A thoughtful approach will allow America to capture the potential value that’s offered by sweeping changes in technologies and policies.

A Beautiful Mess

Only the fittest solutions survive in America’s policy wilderness.

All things being equal, momentous events like the Fukushima nuclear disaster and the Arab spring would bring fundamental changes in U.S. energy policy. But things aren’t equal, and they never will be under America’s democratic and capitalistic process. Frustrating? Maybe, but it’s the only way to ensure our decisions are based on sound economic and environmental principles.

Vendor Neutral

Burbank Water and Power selects Tropos Networks for smart grid project, Survalent Technology installs SCADA system for Pearl River Valley Electric Power Association, Gemma Power Systems signs contract with Bishop Hill Energy, American Superconductor selects subcontractors for the Tres Amigas SuperStation transmission hub in Clovis, N.M., and more ...

Extreme Efficiency

Performance standards are a valid idea—if targets are achievable.

Performance standards are a valid and necessary idea to drive conservation, but only if targets are realistic and achievable. So far, success has been determined by program rationality. A uniform, market-based approach would give retailers flexibility to spur innovation.