Calendar of Events

Jun 17, 2013 to Jun 19, 2013 | Gaylord National Resort & Convention Center in National Harbor, Maryland
Jun 19, 2013 to Jun 21, 2013 | Munich, Germany
Jun 19, 2013 to Jun 20, 2013 | Las Vegas, Nevada

Keywords

Public Utilities Reports

PUR Guide 2012 Fully Updated Version

Available NOW!
PUR Guide

This comprehensive self-study certification course is designed to teach the novice or pro everything they need to understand and succeed in every phase of the public utilities business.

Order Now

Tennessee Valley Authority

Digest

TVA moving ahead with Babcock & Wilcox mPower small modular reactor; Bechtel begins refueling and uprate work at Xcel's Monticello plant; NRG starts operations at 66-MW PV facility; NIST starts developing cybersecurity framework under presidential order; BPA to upgrade HVDC converter station; PacifiCorp working with CAISO to create real-time energy market; Cupertino Electric to install 230-kV line for 200-MW PV plant; plus contracts and announcements from Alstom, Siemens, Echelon, EPRI, Sempra, and others.

Digest

Duke installed a 36-MW energy storage facility at the Notrees wind farm; Ameren Illinois plans to deploy a Landis+Gyr mesh network; GE and Toshiba formed a strategic alliance to develop combined-cycle power projects; Alberta Newsprint contracted Caterpillar to supply gensets totaling 65 MW; Duke Energy plans to retire two coal-fired stations; EDF started operations at a 150-MW wind project; Sempra completed the first 150-MW phase of the Mesquite solar complex; Atlantic Wind selected Bechtel to build an offshore HVDC transmission line; Alstom Grid and Capgemini allied to offer smart grid solutions; plus contracts and announcements from Itron, Qualcomm, Echelon, Siemens, Portland General Electric, Pattern Energy, Juhl Energy, Honda, and others.

People

(March 2013) NSTAR appoints new president; Southern Company names new financial management team; BPA gets new administrator; plus management changes at AEP, Duke, ITC, ConEdison, GDF Suez, ERCOT, MISO, NARUC, and others.

B&W, TVA Plan Small Modular Reactor

Babcock & Wilcox mPower (B&W mPower) and the Tennessee Valley Authority (TVA) signed a contract to prepare and support nuclear regulatory commission (NRC) review of a construction permit application for a B&W mPower small modular reactor (SMR) nuclear plant at TVA’s Clinch River Site in Oak Ridge, Tenn. The DOE awarded a cost-sharing grant to B&W mPower in November 2012. Preliminary work at the Clinch River site is expected to begin once B&W mPower and the DOE sign a cooperative agreement for the grant fund

Tennessee Valley Authority to install electric vehicle charging stations

Tennessee Valley Authority (TVA) will install revenue-grade electric vehicle (EV) charging stations in collaboration with selected distributors in its territory. Installation of the charging stations is scheduled to begin in mid-2013.

People

(December 2012) Tennessee Valley Authority named William D. Johnson president and CEO. Northeast Utilities appointed James W. Hunt as v.p. of regulatory affairs and community relations. Pepco Holdings Inc. promoted Donna J. Kinzel to v.p., treasurer and chief risk officer, Kevin M. McGowan to v.p., regulatory affairs, and O. Ray Bourland to v.p., public policy. And others...

Transactions

(October 2012) Exelon sells plants in Maryland and Cali; Mitsui buys into Viridity; Duke issues $1.2B; plus deals at TVA, Xcel, PG&E, etc. totaling $4.9B.

People

(April 2012) Anne R. Pramaggiore became president and CEO of ComEd, following the retirement of Frank M. Clark, chairman and CEO since 2005. Pramaggiore joined ComEd in 1998 and most recently held the position of president and COO. In addition, ComEd named Tracie Morris v.p. of human resources. Morris previously served as v.p. of human resources for DeVry Inc.

Vendor Neutral

(January 2012) Hawaiian Electric selects Renewable Energy Group to supply biodiesel for combustion turbine; GE signs long-term services agreement with Comision Federal de la Electricidad; Nissan North America selects Coulomb Technologies to provide EV charging infrastructure locations; Siemens agrees to acquire eMeter; plus announcements and contracts involving AES Corp., Maui Electric, KCP&L, and others.

Climate Exposure

A state supreme court ruled last fall that damage resulting from climate change allegedly caused by power plant emissions was “reasonably foreseeable,” and therefore litigation expenses were not covered under a general liability insurance policy. The ruling creates an unworkable standard and raises questions about insurance coverage for climate-change liabilities.

While the policyholder was left adrift by Steadfast, the climate change insurance ship certainly hasn’t sailed.

On Sept. 16, 2011, the Supreme Court of Virginia became the highest state court in the country to rule on the issue of insurance coverage for climate-change claims under a general liability policy. In AES Corp. v. Steadfast Ins.

Pages