Celilo

ABB wins $260 million order to upgrade BPA power station

ABB won an order worth around $260 million from the Bonneville Power Administration (BPA) to upgrade the existing Celilo HVDC (high-voltage direct current) converter station in Oregon. This station is part of the electricity link between the Pacific Northwest and Southern California commissioned in 1970. The Celilo converter station is located at the north end of the Pacific DC Intertie, also known as Path 65, which has a capacity of 3,100 MW, and originates near the Columbia River. The order was booked in the fourth quarter of 2012.