DPR Construction

Digest (August 2014)

Florida Power & Light Company partners with PetroQuest Energy to develop natural gas production wells in southeastern Oklahoma; First Solar receives financing approval to build a 141-MW solar power plant in Chile; DTE Energy will deploy Tollgrade’s LightHouse MV smart grid sensors and predictive grid analytics platform within its distribution network in Detroit; US DOE chooses Abengoa, together with the National Renewable Energy Laboratory and the Colorado School of Mines, to develop a new solar storage technology for thermoelectric plants.

Vista Solar Installs 118-kW SunPower Solar System for DPR Construction

Vista Solar completed a 118-kW high efficiency SunPower solar power system for national builder DPR Construction. The system, which was designed, engineered and installed by Vista Solar, is expected to generate at least 158,000 kW hours of energy each year. To generate the maximum amount of power within limited roof space, Vista Solar installed high-efficiency SunPower X21/345 solar panels.