Path 42

Abengoa to Upgrade a Transmission Line in California

Imperial Irrigation District (IID) chose Abengoa for a power transmission project that includes the upgrade of a 230kV transmission line, as well as substations in the state of California. The “Path 42” project is part of a plan to extend the power network being developed by Imperial Irrigation District in order to increase the capacity of the network and enable access to new sources of renewable energy in California.