toxic

We, the Regulators

The way forward, amidst new markets, technologies, and environmental imperatives.

NARUC’s incoming President – from the Montana PSC – shares his vision on how utility regulators should navigate today’s industry disruptions.

PJM's Three-Way Proposal

A re-defined capacity product, revised parameters for generator performance, and a new role for demand response.

The proposal creates a new capacity product called the “Capacity Performance Resource.”

Playing Safe with Capacity Markets

PJM would minimize risk, but so did regulation.

Changes envisioned by PJM call for ever more structured markets, further reducing the scope of the competitive landscape from which RTOs arose. They may produce a system that is actually more costly and less innovative than regulation.

Keeping a Lid on Coal Ash

EPA’s rule said to favor repurposing and recycling – over landfills or disposal ponds.

The EPA’s new final rule marks a turning point in the handling of coal fly ash. EPA has tried to balance the needs of utilities with existing coal ash deposits and the needs of communities that are worried that such ponds will leak into waterways, or even worse, burst open and wreak havoc. In the process, it’s pleased few.

From Coal to Gas

Regulatory and environmental challenges for power plant conversions under the EPA’s Clean Power Plan.

Converting a power plant from coal to natural gas triggers a host of environmental challenges and regulatory issues. Operators could be trading one set of regulatory obligations, liabilities, and costs for another, equally problematic, set of liabilities and costs.