U.S. Army

Georgia Power to Bring 90 MW of Solar Generation to Georgia Army Bases

Georgia Power plans to build, own and operate three separate solar generation facilities on U.S. Army bases in Georgia. The generation facilities, each capable of producing approximately 30 MW of solar energy, will be located at Fort Stewart near Savannah, Fort Benning near Columbus and Fort Gordon near Augusta. Scheduled to be completed by the end of 2016, the facilities are expected to be the largest solar generation facilities operating on U.S. military bases. 

U.S. Army and Lockheed Martin Commission Microgrid at Fort Bliss

U.S. Army and Lockheed Martin officials commissioned the first U.S. Department of Defense (DoD) grid-tied microgrid integrating both renewable resources and energy storage at Fort Bliss, Texas. The project was funded by the DoD’s Environmental Security Technology Certification Program. The Fort Bliss grid-tied microgrid is designed to reduce overall greenhouse gas (GHG) emissions and energy costs while providing the capability to operate independent of the electric utility grid when needed to provide energy security.