VER

News Digest

State PUCs

STRANDED COST RECOVERY. The Pennsylvania Public Utility Commission allowed Pennsylvania Power & Light Co. to recover $2.9 billion of a requested $4.5 billion in stranded costs, cutting a higher $4-billion allowance proposed earlier by an administrative law judge. The utility petitioned for reconsideration on June 26, after CEO William F. Hecht had called the decision "unacceptable," and noting that the PUC's written order, received June 15, appeared "even more injurious" to the company that the PUC's June 4 bench order.

Renewable Energy: Toward A Portfolio Standard?

DEREGULATION PRESENTS WHAT IS PERHAPS THE BEST opportunity yet for renewables to stake a lasting claim in the electricity market.

Since most energy from renewable sources still isn't priced competitively with fossil-fueled technologies, many restructuring proposals at state and federal levels include various support mechanisms intended to drive down the renewable generation costs. The initial added expense is a necessary trade-off, advocates say, for the resulting reductions in emissions and energy price volatility.

Special Report

DOES THE KYOTO CLIMATE CHANGE TREATY POSE A SEVERE threat to the U.S. economy or is that claim simply a "Chicken Little" prediction of detractors?

Pro-business Republicans, environmentalist bureaucrats and industry observers debated the merits of each position at the Ninth Annual Energy Efficiency Forum in Washington, D.C., on June 10.

One of the most vociferous opponents of the treaty was Rep. F. James Sensenbrenner Jr. (R-Wisc.), chairman of the House Committee on Science, who headed the Congressional delegation to Kyoto, Japan.

Other speakers included Ambassador Stuart E.

News Analysis

POLITICS WON OVER PURPOSE AS AN EARLY VOTE on a nuclear waste bill in the U.S. Senate was itself laid to waste, apparently victim of a contested Senate seat in the state where spent fuel would be stored.

The June 2 vote would have limited debate on H.R. 1270. By getting a vote count, the leanings of senators on the bill would have been tested. And the way would have been paved for Senate Majority Leader Trent Lott (R-Miss.) to schedule a second, more formal vote on the measure.

News Digest

TELEPHONE BILLING PRACTICES. Citing the filed-rate doctrine, which bars deviation from published tariffs, a federal appeals court affirmed the dismissal of two class action suits against AT&T Corp. that sought damages for alleged fraud. The suite arose from AT&T's failure to disclose to its residential long-distance telecommunications customers its practice of rounding charges up to the higher full minute.

Redefining TVA The DOE Study - What Now?

LAST NOVEMBER, Energy Secretary Federico Peña asked the DOE

to study what to recommend about the Tennessee Valley Association in drafting proposed legislation on electric restructuring for the Clinton Administration. He referred the project to a committee of the Secretary of Energy Advisory Board, led by former South Carolina Congressman Butler Derrick.

The committee issued its report on March 31. The DOE had already released its legislative guidelines on March 25, six days earlier.

News Digest

PIPELINE CONSTRUCTION. Chief Judge D. Brock Hornby of the U.S. District Court in Maine, decided to allow Portland Natural Gas Transmission System access to electric transmission corridors owned by Central Maine Power Co. The access will be used to install a natural gas pipeline.

Portland received FERC approval Sept. 24 for installing and operating a 292-mile, $302-million interstate pipeline. CMP owns about 70 miles of the electric transmission corridor. The preliminary injunction, issued April 10, gives Portland access to property on CMP-owned transmission corridors.

Universal Service: A Performance-Based Measure for Competitive Industry

UNIVERSAL SERVICE ATTRACTS MUCH ATTENTION these days, both in energy and telecommunications. But how do you measure success? Do regulators decide when goals are met by looking across an industry, or should management make the call company by company?

Consider the Telecommunications Act of 1996. It identifies the maintenance of affordable, or "universal," service for low-income consumers as an explicit statutory goal. In the electric industry, virtually every piece of restructuring legislation and every regulatory decision to date has included a universal service provision.

News Digest

Courts

ENERGY SUPPORT SERVICES. An Illinois appeals court affirmed a 1997 decision by the state commission that had denied authority to Commonwealth Edison to offer "energy support services," such as design, engineering, construction, analysis and management of electrical power equipment and energy systems. The court made this decision despite the utility's argument that no evidence existed to support the commission's finding that ComEd enjoyed a monopolist's advantage over competitors.

News Analysis

IF AN INDEPENDENT SYSTEM OPERATOR OVERSEES THE TRANS-

mission grid, how much independence is too much? Should ISOs cede control over dispatch to scheduling coordinators, or market functions to a power exchange? Addressing some of these questions, a new report released in April by The Progress & Freedom Foundation criticizes a restructured electric industry built on ISOs with restricted authority.