First Wind reached an agreement with Burlington Electric Department (BED) to sell the utility power generated from the planned Hancock Wind project near Ellsworth, Maine. First Wind will sell 25 percent of the power and renewable energy certificates (RECs) generated at the 54 MW wind farm for the next 10 years under a fixed-price agreement to the Vermont utility. When built, the Hancock Wind project will feature 18 turbines with a capacity of 3 MW each, and it will be situated near the operating 34 MW Bull Hill Wind project in Hancock County, ME, which began operations in November 2012.