Consumers Energy

Stranded Costs for a "Hungry" Utility

Even the FERC's own lawyers urge a new rule when a customer leaves a utility that already has too little capacity.

In a brief filed Aug. 18, staff counsel Theresa Burns and Diane Schratwieser urged the Federal Energy Regulatory Commission to rethink its policy on wholesale stranded costs when a customer threatens to leave but the utility is so short of generating capacity that it can easily make up any lost revenues by reallocating the reserves to other native load customers at prevailing, regulated embedded-cost retail rates.

News Digest

State PUCs

Gas Capacity Rights. The New York PSC told retail suppliers that to serve firm retail gas load they must have rights to firm, non-recallable, primary delivery point pipeline capacity for the five winter months, November through March, or else must augment secondary capacity with a standby charge payable to local distribution companies holding primary rights.

News Analysis

Online services are popping up - for commodity trading, retail marketing and back-office billing. But is the Web right for every application?

A recent study by Connecticut-based META Group Inc. finds that while less than 5 percent of all utility commerce will be conducted electronically in 1999, 30 percent of customer service and retail bill payments will flow over the Internet by 2004. That prediction highlights a torrent of Web activity in recent months, from power trading online to retail solicitations to electronic customer billing and payment.

News Digest

News Digest was compiled by Carl J. Levesque, editorial assistant, Lori A. Burkhart, contributing legal editor, and Bruce W. Radford, editor. For continual news updates, see www.pur.com.Nuclear Power

Transmission & ISOs

Transco Independence. Granting Entergy's request for a declaratory order, the Federal Energy Regulatory Commission ruled in a case of first impression that a stand-alone transmission company ("transco") would meet the test in Order 888 for independent system operators despite passive ownership by a power producer or other market participant.

News Digest

Studies & Reports

Year 2000 Readiness. On Jan. 11 the North American Electric Reliability Council (NERC) predicted a minimal effect on electric system operations from Y2K software problems. The Department of Energy, which had asked NERC to run the electric industry assessment, added that 98 percent of U.S.

News Digest

State PUCs

Distributed Generation. California opened a rulemaking proceeding to consider regulatory reforms in electricity distribution service, with a possible focus on distributed generation. The commission emphasized that its intent was not to define new policies, but to gather information. Comments are due March 17, and the commission intends to consider a proposal from the assigned commissioner this summer. Rulemaking 98-12-015, Dec. 17, 1998 (Calif. P.U.C.).

Gas Transportation Rates.

People

ALLYSON K. DUNCAN joined the Kilpatrick Stockton firm as counsel after having served as a commissioner on the North Carolina Utilities Commission since 1991. Prior to her appointment to the commission, Duncan served as a judge on the North Carolina Court of Appeals.

Two commissioners at the Wisconsin Public Service Commission resigned. Cheryl L. Parrino, chairwoman, resigned after 22 years with the PSC. She recently was appointed CEO of Universal Service Administrative Co. Daniel J. Eastman resigned to rejoin the private sector.

News Digest

Power Pools & Reliability

SUMMER IN WISCONSIN. Responding to concerns about the electric shortages of the summer of 1997 and fears that they could happen again, Wisconsin PSC Commissioner Joseph P. Mettner has indicated that the state's energy supply outlook for the summer of 1998 appears much better in eastern Wisconsin than it did one year ago.

Mettner noted that Wisconsin's electric supply system is operating with expected reserve margins of 19.2 percent. But he cautioned that electric power flows do not respect borders.

News Digest

PIPELINE CONSTRUCTION. Chief Judge D. Brock Hornby of the U.S. District Court in Maine, decided to allow Portland Natural Gas Transmission System access to electric transmission corridors owned by Central Maine Power Co. The access will be used to install a natural gas pipeline.

Portland received FERC approval Sept. 24 for installing and operating a 292-mile, $302-million interstate pipeline. CMP owns about 70 miles of the electric transmission corridor. The preliminary injunction, issued April 10, gives Portland access to property on CMP-owned transmission corridors.

News Digest

Courts

ENERGY SUPPORT SERVICES. An Illinois appeals court affirmed a 1997 decision by the state commission that had denied authority to Commonwealth Edison to offer "energy support services," such as design, engineering, construction, analysis and management of electrical power equipment and energy systems. The court made this decision despite the utility's argument that no evidence existed to support the commission's finding that ComEd enjoyed a monopolist's advantage over competitors.