Nuclear Regulatory Commission

Michigan Asks NRC to Act on Fuel Cask Procedures

Michigan Attorney General Frank J. Kelley has filed a request to intervene in an action pending before the Nuclear Regulatory Commission (NRC). The action concerns the NRC's failure to address a request by Consumers Power Co. to unload spent, high-level nuclear fuel from a defective cask at the Palisades nuclear plant.

Kelley is filing in support of a petition by two consumer groups that want the NRC to prevent Consumers from using dry-cask storage because the utility has violated its license to operate that system.

Watts Bar Goes on Line

The Nuclear Regulatory Commission (NRC) has authorized the Tennessee Valley Authority (TVA) to load fuel and perform low-power testing of the Watts Bar nuclear plant. The low-power license will allow the 1,160-megawatt Unit 1 to operate at 5 percent of capacity. The license verifies that Watts Bar construction is complete, and that all safety and environmental requirements have been met. A license to operate at full power may be granted once the fuel loading and low-power testing is complete. Commercial operation is anticipated for spring 1996.

Salem Outage Catches Moody's Eye

The Nuclear Regulatory Commission has imposed a $600,000 civil penalty on Public Service Electric and Gas Co. (PSE&G) for six violations at the Salem Nuclear Generating Station. PSE&G, which owns and operates 42.59 percent of the plant, responded by shutting Salem down temporarily.

"We take no issue with the concerns raised by the NRC," says Leon R. Eliason, PSE&G chief nuclear officer and president of its nuclear business.

TMI Plaintiffs Can Seek Damages

The U.S. Court of Appeals for the Third Circuit on October 17 ruled that plaintiffs claiming injuries related to the 1979 accident at Unit 2 of the Three Mile Island nuclear plant (TMI-2) may seek punitive damages. Plaintiffs may receive compensatory and punitive damages under the Price-Anderson Act from: 1) primary financial protection provided through commercial insurance policies, which is required of all nuclear utilities; and 2) secondary financial protection in the form of private liability insurance under an industry retrospective rating plan.

People

Robert S. Silberman has joined California Energy Co. Inc., the largest independent geothermal power producer in the world, as senior v.p. of project development and implementation.NUI Corp. has appointed James R. Van Horn general counsel and corporate secretary. Van Horn was previously senior v.p., general counsel, and secretary at Citizens First Bancorp. Inc.

The interim board of directors of WorldTel has elected Sam Pitroda chairman.

Nuclear Registration: The Untold Story

Last year was pivotal for nuclear power. On May 13, 1994, the board of directors of the Washington Public Power Supply System (WPPSS) voted 9-4 to terminate reactors WNP-1 and WNP-3, triggering a dismantling of the two mothballed reactors, both about 70 percent complete. For ratepayers in the Pacific Northwest, the decision offered no relief from bills for construction of the two plants (em recently estimated at about $350 million per year for the next 24 years1. In many ways, WPPSS and its troubled history is a microcosm of the U.S.

NRC Amends Licensing Renewal Process

The Nuclear Regulatory Commission (NRC) has amended its regulations on nuclear plant license renewal to provide a "more stable and predictable regulatory process." The amended regulations will enhance the credibility of the NRC's existing regulatory oversight process and licensee maintenance programs by narrowing the number of systems, structures, and components that must be reviewed during the renewal process. Operating licenses are granted for periods up to 40 years, and may be renewed for 20 more if NRC requirements are met.

People

Philip R. Sharp, former 10-term congressman from Indiana, has been named director of the Institute of Politics at Harvard University's John F. Kennedy School of Government. Sharp assumes the position on July 1, succeeding Charles Royer, former mayor of Seattle, WA.

NICOR Inc. has elected Thomas L. Fisher, currently president and COO, to the additional position of CEO. Fisher will continue as president and CEO of Northern Illinois Gas Co., the company's largest subsidiary.

Charles W.