What Solar Success Looks Like
Managing the transition to a solar-powered future.
Managing the transition to a solar-powered future.
Siemens Energy received an order from Portland General Electric for the supply and installation of 116 wind turbines. The wind turbines, each with a rating of 2.3 MW and a rotor diameter of 108 meters, are to be installed at the Tucannon River Wind Farm in Washington state. Siemens will be responsible for service for the wind turbines over a period of five years.
A practical guide to explaining the value of the smart grid.
Utilities face rate pressure as financing costs hit rock bottom.
(November 2012) Fortnightly’s annual rate case survey is designed to give readers a look at rates of return on equity (ROE) awarded in state-level retail base rate proceedings for electric and natural gas utility companies. An examination of the reasoning and commentary contained in these orders provides a glimpse into economic factors considered by regulators as they seek to balance the interests of investors and consumers when authorizing utility ROEs.