Business & Money

Smart-Grid Stimulus

Utilities hurry up and wait to apply for grant money.

The American Recovery and Restructuring Act (ARRA, or the Recovery Act), signed into law in February, provides $4.5 billion in stimulus funding for programs aimed at “electricity delivery and energy reliability activities to modernize the electric grid.” This funding commitment, and swirl of industry and lawmaker activities since, has helped lift the smart-grid agenda out of the shadows of utility engineering departments and into the public’s broader view.

Reducing Lifecycle Expenditures

Total cost of ownership accounting optimizes long-term costs.

A large regional utility forfeited significant operating revenues after it replaced pulverizers at several of its coal-fired power plants. Because the replacement pulverizers were sized to operate at 100-percent capacity during operations using the coal typically procured by the utility, upgraded plants had to be derated following a change to lower BTU-rated fuel. If utility decision makers had used a total cost of ownership (TCO) framework, they could have avoided this situation.

Saving Depreciation Accounting

Avoiding ‘earnings management’ requires transparency in reporting standards.

The SEC is taking steps toward substituting International Financial Reporting Standards for U.S. Generally Accepted Accounting Principles. Having certainty surrounding existing utility asset and depreciation accounting practices enhances the ability to use financial statements to accurately depict the results of operations and financial status of reporting entities.

Goodbye Safe Haven?

Risk avoidance drives utility stock performance.

Utility stocks historically have been a safe haven, a stable, long-term investment for widows and orphans. However, with banks collapsing and the economy falling into a recession, utility stocks as a whole recently have performed poorly, with our portfolio of 75 companies losing $200 billion in market value in 2008.

Ready for IFRS?

International reporting standards are coming for U.S. public companies.

Adoption of IFRS (International Financial Reporting Standards) in the United States undoubtedly will mark a significant change for many U.S. companies. But this change should not be feared. Moving to an entirely new accounting structure ultimately might enable companies to streamline reporting processes and reduce compliance costs.

The Innovation Imperative

Adaptive companies stand the greatest chance for success.

IBM compiled a comprehensive report, The Enterprise of the Future, which describes traits that the leading companies across all industries will share. Key industries—including utilities—also were evaluated individually to see how these traits might emerge as industries reshape and evolve in the face of customer demands, environmental pressures, global integration, workforce changes, and other challenges.

Fixing Depreciation Accounting

Accumulated provisions for depreciation belong on the right side of the balance sheet.

The time has come to revisit where the accumulated provision for depreciation belongs. Utilities objected—some 50 years ago—when it was moved from the right side of the balance sheet to the left side, with good reason. Consistency, comparability, reliability and relevance all demand an end to this strange accounting practice.

Capital Conundrum

The Big Build will test the industry’s access to Wall Street.

The era of easily available, affordable energy rapidly is ending and our society is realizing that our energy infrastructure is severely inadequate to supply the energy demands of the future. The major issue facing the sector today is how to fund and deliver this new climate-friendly infrastructure, which is currently estimated will cost almost $2 trillion between now and 2030.

Securitization, Mach II

Green investments require bulletproof financing.

Originally developed to compensate U.S. electric utilities for regulatory assets rendered uneconomic by deregulation, so-called “stranded-cost” securitization techniques are finding new applications. To date, utilities have issued approximately $40 billion of stranded-cost securitizations. That number could increase dramatically if the industry applies well-tested securitization techniques to the extraordinary costs it faces in the future.

PV vs. Solar Thermal

Distributed solar modules are gaining ground on concentrated solar thermal plants.

Photovoltaic technologies are beginning to appear more attractive than concentrated solar thermal plants. PV’s competitiveness is improving from technical and operational advancements, as well as significant commitments made by such utilities as Southern California Edison. In the long run, distributed central PV plants likely will gain a strong market position.