Analytics

Vendor Neutral

(October 2011) Wind Capital group selects RMT Inc. to design and construct wind energy facility; MEMC Electronic Materials, Inc. and SunEdison acquire Fotowatio Renewable Ventures; Solar Community and Reliant Energy team up to offer financing options; KEMA selects Green Energy Corp.’s software; Leviton unveils commercial electric vehicle charging stations; plus announcements and contracts involving Science Applications International Corp., Tantalus, FirstEnergy Nuclear Operating Co. and others.

Yes, We Have No Negawatts

When you sell demand response back to the grid, how much capacity are you now not buying?

When customers sell demand response into a regional capacity market (such as PJM’s Reliability Pricing Model, known as the RPM), how much credit should they earn for agreeing to curtail demand and alleviating stress on the grid — that is, for reducing the market’s need for generating capability and capacity reserve margin? And further, should the amount of credit depend on whether the customer works with market aggregators, known both as CSPs (“Curtailment Service Providers”) or ARCs (“Aggregators of Retail Customers”)? One view would pay customers for the full extent of their curtailment of demand — known as its “Guaranteed Load Drop” (GLD). The other would limit capacity credit to the customer’s prior load history — “Peak Load Contribution,” or PLC. The answer may well dictate whether regulators continue to treat “energy” and “capacity” as two distinct concepts.

Capacity Roulette

Out of market means out of luck—even for self-supply.

When the U.S. Federal Energy Regulatory Commission issued its so-called ”MOPR“ decision in April 2011, approving a minimum offer price rule (or bid floor) for PJM RPM capacity market — and then on the very next day did much the same for New England’s FCM capacity market — FERC did more than just prop up prices. Instead, it created a nightmare scenario for utilities that still own their own generation. These utilities, who choose to “self-supply” with their own plants, rather than buy capacity from either the RPM or FCM, adequacy rules, could now be forced to pay twice for capacity — if their own plants are deemed inefficient or uneconomic.

CPUC Targets Privacy Worries

The California Public Utility Commission’s recent proposed rule aims to protect customer privacy while also facilitating third-party access to smart meter data for energy management, demand response and other customer service applications. But does it go far enough?

The ruling applies to any services that keep collecting and using data without any active role on the customers’ part.

In response to direction from the state legislature to protect customer data privacy as smart meters are installed, California Public Utility Commission President Michael Peevey issued a notice of proposed decision in Rulemaking 08-12-009(“Decision Adopting Rules to Protect the Privacy and Security of the Electricity Us

Vendor Neutral

(March 2011) TVA and EPRI demonstrate solar-assisted EV charging station; Ford unveils the all-electric Focus; Central Maine Power awards substation contracts; ERCOT deploys ABB software in nodal market; FirstSolar starts up PV plant for Southern Company and Ted Turner; plus contracts and announcements involving Open Systems International, Verizon, Suntech Power, Alcatel-Lucent, Siemens, Cisco, Elster, Sensus, Silver Spring Networks and others.

Capacity Contest

Raising the stakes in RTO markets.

Generators and demand-response providers are reaping rewards in forward capacity auctions, causing suppliers to go shopping for the most lucrative markets. Now the Midwest ISO is trying to catch up, by proposing its own auction for years-ahead resource bids. But does RTO shopping serve the interests of customers, who are legally entitled to rates that are just and reasonable? Why are some state policy makers advocating a return to old-school RFPs for long-term contracts?

DR Distortion

Are subsidies the best way to achieve smart grid goals?

FERC has proposed that wholesale energy markets should subsidize load reductions with full LMP (locational marginal price), without deducting the customers’ retail savings. Such a policy could distort the market, and other solutions might achieve the same objectives more efficiently.

Not So Fast

Proving market performance requires detailed analysis.

Now that fuel prices have fallen recently from the highs seen in 2008 and wholesale electricity prices also have decreased, it might be tempting to attribute the lower prices to the restructuring of the wholesale electricity markets. Unfortunately, it’s a little more complicated than that.

Negawatt Pricing

Economists take sides in the battle for DR’s soul.

Back when the U.S. economy and power consumption still were bubbling, PJM reported in August 2006 that customer curtailments during a week-long August heat wave had generated more than $650 million in market-wide energy savings—all at a mere $5 million cost, as measured in direct payments made to the demand response (DR) providers, set according to wholesale power prices prevailing at the time. Where else but the lottery can you get an instant payoff of 130-1?

RTOs and the Public Interest

Defining the mission when the consumer plays second-fiddle to the needs of the market.

Six months back, when ISO New England was mulling over various reforms that FERC had mandated last fall in Order 719 for the nation’s six regional transmission organizations and independent system operators (RTOs and ISOs are interchangeable terms in this column), the ISO refused point blank to include in its mission statement a proposal by stakeholders that it should operate the bulk power system at the “lowest reasonable cost.”