Federal Energy Regulatory Commission

Encore for Negawatts?

Congress renews PURPA’s call for conservation and load management, but the world has changed since the 1970s.

The “N-word” in the title first appeared in this journal more than 20 years ago, courtesy of the celebrated environmentalist Amory Lovins and his widely quoted piece, “Saving Gigabucks with Negawatts” (Fortnightly, 1985). Scroll forward a few decades. With restructuring of wholesale electric markets at FERC, plus formation of regional transmission organizations and independent system operators, the game was changed.

The CIO Forum: The Changing Face of Energy I.T.

Budgets are expected to increase, even as new IT challenges present themselves.

In our annual technology forum, we talk with tech/information specialists at four companies: Patricia Lawicki at PG&E; Ken Fell at the New York ISO; Mark C. Williamson at American Transmission Co.; and John Seral at GE Energy.

NERC Knows Best?

FERC this year must select a reliability czar. But the obvious choice could prove less than ideal.

NERC up until now has been, in its own words, “a self regulatory organization, relying on reciprocity, peer pressure, and the mutual self-interest of all those involved in the electric system.” Nevertheless, can this tradition of kind, gentle, and voluntary consensus-building stand NERC in good stead as it seeks to transform itself in to a steel-fisted czar that would enforce mandatory standards?

Electric Transmission: Building the Next Interstate System

We must efficiently deliver wholesale power within competitive regional markets.

When President Eisenhower was growing up in Kansas, he saw America’s byways and back roads develop to meet point-to-point needs, eventually forming a loosely connected national interstate highway network. The U.S. electric transmission system has similar roots, and it needs a similar vision to meet the needs of the 21st century.

Tariff Tinkering

FERC says it won’t ‘change’ the native-load preference, but don’t bet on it.

When FERC opened wholesale power markets to competition a decade ago in Order No. 888, it codified a system for awarding grid access known as the pro forma Open-Access Transmission Tariff (OATT), founded on physical rights, and on the fiction that electrons travel along a “contract path.” Should the commission “tinker” with the OATT, making only surgical changes to make it current? Or, do events instead warrant a complete overhaul?

Regulators Forum: Shifting Winds, Shifting Strategies

State regulators grapple with investments, supply planning, and structural issues.

The opposing challenges of higher gas prices and rising environmental concerns have put utility regulators in a difficult position: How can they bring rate stability while minimizing environmental impacts? At the same time, they are grappling with trends in consolidation, competition, transmission planning, and distribution service quality. Each state brings a different view of the changing utility landscape. For insight, Fortnightly brought together regulators from several states to discuss their plans and priorities for today and the future.

Focus on LNG Siting: A State Perspective

Congress revamps LNG and storage, giving broad new powers to FERC. Why the Feds still must consult with local authorities.

A major objective of the Energy Policy Act of 2005 (EPACT) is to counter the worsened conditions in the natural-gas market that began in 2000 and are expected to continue over the next several years—namely, tight natural-gas supplies and high, volatile gas prices caused by a distinct shift in the supply-demand balance. Any noticeable reductions in gas prices that might be effectuated by the act will have little impact on natural-gas prices for a number of years.

The Gas Storage Conundrum

Congress allows market-based rates. How will FERC respond?

As a rare amendment to a venerable statute, EPACT05 § 312, New Natural Gas Storage Facilities, made headlines, adding an option for interstate, market-based storage rate making. It would encourage new storage facilities by permitting FERC to authorize market-based storage rates, even when the applicant is unable to demonstrate it lacks market power. After authorizing such rates, FERC periodically must review them.The problem with the new law is that it does not specify those review periods.

Frontlines

Is the predicted crisis this winter a failure of policy, the market, or both?

Given the free market in natural gas, why haven't prices attracted the needed infrastructure or supply? (LNG imports are actually down from last year.) What policies could have been contemplated ahead of national legislation? Or put more simply, why has supply lagged demand?

Commission Watch

FERC mulls rival plans at the last minute, while on the West Coast, California gets into the game.

FERC, the ISO, and many other parties had seen no reason for further debate over the need for a location-specific capacity market. By limiting debate, FERC had foreclosed a raft of competing ideas. When the moment finally arrived for the oral argument at FERC, attorneys and witnesses attempted valiantly in the precious few minutes allotted each speaker to flesh out new ideas, and the commissioners struggled as well to keep up. This highly unusual situation made for a helter-skelter hearing, with new topics seeming to come out of the woodwork.