Unsubscribed Capacity: A Growing Problem
An LDC Caucus report, An Issue Paper Regarding Future Unsubscribed Pipeline Capacity, forecasts an increase in reduced subscriptions of firm capacity due to a combination of factors:
s Shifting patterns of gas purchasing will reduce the need for transportation over certain pipeline corridors.
s Single-fixed-variable rate design makes capacity reservation costly for LDCs with low load factors.