PJM Power Providers

Capacity Roulette

Out of market means out of luck—even for self-supply.

When the U.S. Federal Energy Regulatory Commission issued its so-called ”MOPR“ decision in April 2011, approving a minimum offer price rule (or bid floor) for PJM RPM capacity market — and then on the very next day did much the same for New England’s FCM capacity market — FERC did more than just prop up prices. Instead, it created a nightmare scenario for utilities that still own their own generation. These utilities, who choose to “self-supply” with their own plants, rather than buy capacity from either the RPM or FCM, adequacy rules, could now be forced to pay twice for capacity — if their own plants are deemed inefficient or uneconomic.

One if by Wholesale, Two if by Retail

Which path leads to the smart grid?

A fierce debate has erupted in the utility policy community, with battle lines drawn within FERC itself. In the effort to improve system efficiency, two competing alternatives stand out: to build the smart grid on large-scale demand response (DR) programs, or to build it around consumer behavior in retail markets.

RTOs and the Public Interest

Defining the mission when the consumer plays second-fiddle to the needs of the market.

Six months back, when ISO New England was mulling over various reforms that FERC had mandated last fall in Order 719 for the nation’s six regional transmission organizations and independent system operators (RTOs and ISOs are interchangeable terms in this column), the ISO refused point blank to include in its mission statement a proposal by stakeholders that it should operate the bulk power system at the “lowest reasonable cost.”

Buyer's Remorse

The PJM complaint and the rising cost of electric reliability.

Who says ratepayers must accept the traditional measure of electric reliability—a single one-hour outage every ten years? If shown the bill ahead of time, might they decide otherwise; that such luxury is no longer affordable? Consumers are making similar decisions about gasoline and mortgages. Why not electricity?

No Generator Left Behind

A new theory on capacity markets and the missing money.

On Wednesday May 7, FERC will host a conference in Washington, D.C. that might prove extraordinary. The commission staff promises not only to review the forward capacity markets now operating in New England and PJM—each a story unto itself—but also to discuss a new rate-making theory that has come virtually out of nowhere and which proposes to help solve the notorious “missing money” problem.