PSEG Solar Source

Transactions (September 2014)

Duke Energy Progress agreed to purchase $1.2 billion of certain generating assets from North Carolina Eastern Municipal Power Agency; Acquisitions by PSEG Solar Source and SunEdison; Exelon will provide equity financing for 21 MW of Bloom Energy fuel cell projects; Debt issues from Calpine and NRG Yield Operating.

PSEG Solar Source to Acquire 13 MW Texas Solar Project From juwi solar

PSEG Solar Source acquired the El Paso Solar Energy Center, a 13-MW solar energy facility near El Paso, TX from juwi solar (JSI). The project was originally developed by JSI and has a 30-year PPA with El Paso Electric.The $22 million acquisition will increase PSEG's Solar Source's portfolio capacity to 106 MW. JSI is the EPC contractor for the project and will operate the project for PSEG Solar Source upon completion. Construction has already commenced and is expected to be completed by year's end. The project will use JA solar panels.

Digest

ABB commissions microgrid on Portuguese island; Panda orders Siemens generating units for 829-MW plant; Burlington Electric Department enters 54-MW PPA with First Wind; Tantalus and Itron contract for smart metering and smart grid system in Washington; EdF orders 220 MW of wind turbines from Vestas; MidAmerican orders 1,050 MW of wind turbines from Siemens; plus contracts and announcements from GE, PSEG, Arizona Public Service, Dominion, Entergy, Xcel, PSE&G, and others.

PSEG Acquires Two Power Plants from Canadian Solar

Canadian Solar’s subsidiary, CSI Holdco LLC sold two utility-scale solar power plants totaling 4.4 MW to PSEG subsidiary, PSEG Solar Source. The plants have a 20-year off taking agreement with PG&E. The solar installations, together now called the PSEG Shasta Solar Farm, is built at over 3,300 feet in elevation between Mount Lassen and Mount Shasta located in northern California. Construction started in July of 2013, with commercial operation expected in early 2014.

Digest

(January 2013) Dominion Virginia Power contracts Alstom for HRSGs at 1,300-MW Brunswick County station; Entergy acquires KGen plants; San Diego Gas & Electric installs new outage management system; ChargePoint enters reseller agreement with Service Solutions; Saft to install battery storage project at High Wind project in Saskatchewan; NRG’s eVgo finalizes plans for California charging network; plus contracts and announcements from ABB, ADT, Elster, Itron, ElectroIndustries, Opower, Panasonic, FirstEnergy, PacifiCorp, and others.

Transactions (November 2012)

Southern Company and Turner purchase SunEdison 30-MW PV plant; PSEG acquires 15-MW PV project from Juwi Solar; Duke issues $650 million in 30-year notes; PSE&G floats $350 million; Sempra and SoCal Gas each issue $350 million in bonds; plus bond issues from ONEOK, Regency Energy, ComEd, Tampa Electric, DTE, and Tucson Electric, totaling $4.8 billion.

Vendor Neutral

Calpine signs PPA with Public Service Company of Oklahoma; TransCanada and Ontario PowerAuthority agree to develop 900-MW gas-fired power plant; Panda selects Siemens to build combined-cycle plant; Progress Energy retires coal plants dating from 1923; Southern Company and Turner acquire 30-MW PV project; PSO begins smart meter pilot rollout; Southern California Edison contracts with Corix to install smart meters; Iberdrola USA hires Burns and McDonnell to review grid infrastructure. Plus contracts and announcements from Itron, eMeter, Echelon, Quanta Services, DNV, Metadigm, Landis+Gyr, and others.