RPM

The Nation's Grid Chiefs: On The Future of Markets

Exclusive interviews with the CEOs of five regional transmission systems.

Exclusive interviews with CEOs at five regional independent transmission system operators: Phil Harris, at PJM; Gordon van Welie, at ISO New England; Yakout Monsour, at the California ISO; Graham Edwards, at MISO; and Mark Lynch, at the New York ISO.

One RTO, Two Systems

By trying to placate regulated states—letting utilities “opt out” from its capacity market—PJM finds its RPM idea under fire.

While the PJM Interconnection has made no major changes to its prototype capacity market since it proposed the idea a year ago in August, and though it has won a tacit OK from federal regulators for many of the plan’s key elements, don’t expect to see a slam dunk when the time comes for a final review of the controversial idea, known as the Reliability Pricing Model.

Kicked Off and On Schedule

Cal-ISO files a new market design, but has it traded efficiency for software?

Eyeing a launch date of November 2007, Cal-ISO at last has come forward with plans for revamping its widely disparaged wholesale market design. The formal proposal, known as the MRTU (Market Redesign and Technology Upgrade), was filed this past February at FERC.

In the Mainstream: Wind Turbines Take Off

New technologies are helping windpower mature as a viable power supply choice for utilities.

Few people understand how to ride shifting winds better than Jim Dehlsen does. Dehlsen founded Zond Energy Systems 25 years ago, and steered the company through a series of major changes and challenges—the oil-price collapse of the 1980s; ambivalent energy policies, with on-again, off-again production tax credits; and the sale of controlling interests in Zond to Enron in the late 1990s. Should it come as any surprise, then, that Dehlsen still is bullish on windpower’s prospects?

Barriers to Transmission Superhighways

History teaches us that the most successful American businesses emerge from the crucible of competition.

Important challenges still confront the development of a coherent strategy to create an efficient modern transmission system. Assuming FERC and Congress are earnest about creating a 21st century grid, new ideas, projects, and technologies need to emerge.

One Fine Reliability Mess

Infrastructure isn't keeping pace. So how to "help" the market without killing it?

What's the right price signal to bring forth enough infrastructure to maintain reliability over the long haul? Moreover, if such a model exists, can it work without stifling competitive markets?

Commission Watch

What everybody missed in setting up the regional grids.

Commission Watch

What everybody missed in setting up the regional grids.

While the electric utility industry has largely agreed on what elements to include in a standard market design (SMD) to govern wholesale power trading in a given region, recent experience shows that the regulators from time to time have overlooked a number of things.