Department of Energy

Blue Ribbon Mission

Can a broadly based committee resolve the nuclear waste dilemma?

The Department of Energy assembled an all-star Blue Ribbon Commission on America’s Nuclear Future. With such political and industry heavyweights as Brent Scowcroft, Lee Hamilton and John Rowe, the commission must be taken seriously. But can a broadly focused committee finish the decades-long battle to close the nuclear fuel cycle?

Got Prepaid?

Smart meters open the door to advance billing.

Investor-owned utility executives have long understood the benefits of prepaid metering, but technical and regulatory roadblocks have prevented wide-scale implementation. Now, however, two IOUs—Arizona Public Service and DTE—are planning prepaid metering programs that could be offered to all customers. Smart metering technology might pave the way for prepaid to become a standard service.

Proving Smart-Grid Savings

Real-world projects show tangible returns.

Much is riding on successful smart-grid deployments. Experiences at several utilities demonstrate the costs and benefits of today’s automation technologies.

Business Case Tradeoffs

Shaping long-term smart-grid strategy.

Making the business case for the smart grid is an important utility goal. It provides the justification for making or deferring required investments. Utilities might find it necessary to engage in a cycle of continuous strategic planning.

Cap and Innovate

An alternative approach to climate regulation.

Low carbon prices might not produce sufficient incentives for firms to innovate and reduce emissions in the long run. But relatively high carbon prices can be politically unacceptable and invite consumer backlash. Where’s the right balance? A PUC chairman offers an alternative approach to managing GHG emissions.

The Incredible Shrinking Reactor

Small is beautiful for nuclear developers.

Small modular reactors (SMRs) are nuclear generating units that are about the size of railroad cars and provide about one-tenth to one-fourth the power of full-size reactors. As a result, they cost a fraction of what full-size reactors cost. The reactors are designed to provide between 40 MW and 300 MW of electric power, compared with the 1,100 to 1,700 MW output of larger reactors. In addition, most are expected to cost under $1 billion, compared with the $5 billion to $10 billion price tags of the larger units.

Reconsidering Resource Adequacy, Part 1

Has the one-day-in-10-years criterion outlived its usefulness?

The one-day-in-10-years criterion might have lost its usefulness in today’s energy markets. The criterion is highly conservative when used in calculating reserve margins for reliability. Can the industry continue justifying the high cost of overbuilding?

Integrating Renewables

Opportunity for advancement or exercise in futility?

The power grid has been slow to embrace renewable energy sources. In order to allow renewable energy sources to evolve into a solution rather than a headache, new tools and processes will need to be developed to forecast and control renewable production capabilities.

Smart Grid Consensus

Workable standards require utility input.

The IEEE P2030 Work Group is developing standards to encourage seamless deployment, integration and operation of energy, information and communication technologies across the smart grid. Utility input and engagement is needed to produce workable standards.

Tomorrow's T&D

The most economical energy savings might be found in grid efficiency.

Power delivery efficiency gains constitute a valuable utility asset that can offset or defer new generation and T&D investments. Enabling technologies, utility demonstration projects and supporting regulatory frameworks are needed to validate potential savings.