Order 679

Looking Beyond Transmission

FERC Order 1000 and the case for alternative solutions.

How FERC Order 1000 gives short shrift to NTAs (non-transmission alternatives) in regional system planning—while consumers pay the price.

Killing the Goose

Second thoughts on transmission’s golden egg.

The electric utility industry offers up a wealth of ideas on how the Federal Energy Regulatory Commission might reform its policy, adopted under FERC Order 679 in 2006, of granting financial incentives for investments in transmission line projects that ensure reliability or mitigate line congestion so as to reduce the cost of delivered power. Fortnightly’s Bruce W. Radford reports.

Transmission Rate Incentives

In an October order, the Federal Energy Regulatory Commission (FERC) trimmed the authorized rate incentive for the RITELine transmission project by one-third. The action prompted Commissioner Moeller to ask whether the commission is retreating from its incentive policy on needed transmission lines.

FERC’s move might appear calculated to send a message to the power industry.

The Federal Energy Regulatory Commission (FERC) in mid-October granted a trimmed-down set of rate incentives for the proposed $1.6 billion RITELine transmission line project.

Treading Water

With no guidance yet from FERC, Atlantic Wind is forced to wait.

Touted as the nation’s first-ever “offshore transmission highway,” the proposed Atlantic Wind Connection (AWC) high-voltage power line in theory could foster dozens of wind farms in shallow offshore costal waters up and down the mid-Atlantic seaboard — but only if federal regulators can get buy-in for new transmission planning rules that give precedence to large, macro projects aimed at boosting renewable energy. Otherwise, the grid project might never pass muster with the engineers charged with OK’ing new power lines, since the AWC is probably not needed to maintain reliability, and likely would not make electricity rates any cheaper for East Coast ratepayers. Should wind energy developers start with massive grid projects to attract clusters of wind turbines, or should the wind farms come first?

Chicken-Egg Solution

Solar and wind developers learn to shift project risk to the grid.

As Google says, “the wind cries for transmission.” But the opposite is true as well: without new wind and solar energy projects, we would not need to build so many new transmission lines. Each side needs the other, yet neither dares declare too soon, and risk weakening its bargaining position. That is, until one utility in California found a way to break the impasse, with each side scratching the other’s back — thus putting to rest the age-old question, “Which came first, the . . . ?”

First Refusals, Least Regrets

What California can teach FERC about transmission planning.

The California ISO is going its own way with its proposal for transmission planning, virtually ignoring FERC’s proposed rules on transmission planning and cost allocation. California wants to bring method to the madness of developing transmission projects, and its approach has raised hackles in the industry. The dispute defines the battle over America’s most attractive market for rate-regulated investment.

Outsmarting the Grid

A trio of eager tech startups confronts an industry intent on preserving the status quo.

In light of all the excitement created by smart-grid regulatory initiatives and stimulus funding, three clever tech startups have come forward with proposals for novel grid projects. In California, Western Grid Development proposes to install energy storage devices ranging in size from 10 to 50 MW at various discrete and strategic locations in PG&E’s service territory where the California ISO has identified reliability problems. Second, a company called Primary Power proposes to deploy a total of four advanced, 500-MVAR static VAR compensators (SVC) at three separate locations within the PJM footprint. Third, in Clovis, N.M., Tres Amigas plans to allow power producers to move market-relevant quantities of electric power and energy between and among the nation’s three asynchronous transmission grids: ERCOT and the Eastern and Western Interconnections.

Federalizing the Grid

Renewable mandates will shift power to FERC but pose problems for RTOs.

A recent survey conducted by the U.S Office of Personnel Management and reported by the Washington Post on March 13 ranked the Federal Energy Regulatory Commission as eighth best of some 37 federal agencies in terms “talent,” and third in “leadership and knowledge.”

Titans of Transmission

ITC and AEP jockey for the lead in building the grid of tomorrow.

On February 9, a group of the nation’s major grid system operators released a study estimating the nation’s electric industry sector needs to spend some $80 billion—more than 10 times the size of that portion of the Obama stimulus package directed specifically at transmission construction—in order to achieve a 20 percent retail penetration for renewable wind energy in just the Eastern Interconnection.

Transmission Incentive Overhaul

FERC’s ROE incentive adder policy sends the wrong signals.

FERC is offering incentive rates to entice transmission investment. But the authors identify serious flaws in emerging policy regarding return on equity (ROE) incentive adders. Determining whether and when ROE adders are appropriate requires a more deliberative approach.