Bonneville Power Administration

A Beautiful Mess

Only the fittest solutions survive in America’s policy wilderness.

All things being equal, momentous events like the Fukushima nuclear disaster and the Arab spring would bring fundamental changes in U.S. energy policy. But things aren’t equal, and they never will be under America’s democratic and capitalistic process. Frustrating? Maybe, but it’s the only way to ensure our decisions are based on sound economic and environmental principles.

Frontiers of Efficiency

What conservation potential assessments tell us about ‘achievable’ efficiency.

Regulators across the country are relying on conservation-potential assessments to guide their policy decisions. Models based on macroeconomic analysis, end-use forecasting and accounting measurements provide different ways to assess the achievability of conservation and efficiency goals.

Vendor Neutral

Burbank Water and Power selects Tropos Networks for smart grid project, Survalent Technology installs SCADA system for Pearl River Valley Electric Power Association, Gemma Power Systems signs contract with Bishop Hill Energy, American Superconductor selects subcontractors for the Tres Amigas SuperStation transmission hub in Clovis, N.M., and more ...

Vendor Neutral

Lockheed Martin teams with Tendril; Pattern Energy 101 MW wind plant starts operating; Alstom to supply steam equipment to GWF plant; Siemens wins government efficiency contract; GE Jenbacher introduces high-efficiency gas engine; OpenADR Alliance forms; Better Place gets into San Francisco taxis; EnerNOC enters TransAmerica Pyramid; and more.

Extreme Efficiency

Performance standards are a valid idea—if targets are achievable.

Performance standards are a valid and necessary idea to drive conservation, but only if targets are realistic and achievable. So far, success has been determined by program rationality. A uniform, market-based approach would give retailers flexibility to spur innovation.

Titans of Transmission

ITC and AEP jockey for the lead in building the grid of tomorrow.

On February 9, a group of the nation’s major grid system operators released a study estimating the nation’s electric industry sector needs to spend some $80 billion—more than 10 times the size of that portion of the Obama stimulus package directed specifically at transmission construction—in order to achieve a 20 percent retail penetration for renewable wind energy in just the Eastern Interconnection.

People

(September 2007) DPL Inc. promoted Bryce Nickel to vice president of transmission and distribution operations. DPL also announced the promotion of Kevin Hall to director, transmission and distribution engineering. MDU Resources Group Inc. promoted Cynthia J. Norland, assistant vice president of administration, to vice president of administration. Portland General Electric Co. named Jay Dudley vice president, general counsel, and compliance officer. And others...

California vs. Oregon

An expiring 40-year-old contract rocks the Pacific AC Intertie.

PacifiCorp informed FERC, PG&E, and the state of California that it would not renew the contract upon its long-anticipated expiration date of July 31, 2007. Instead, it would take back full ownership of its transmission-line rights and sell the available capacity into the open market under its own tariff at today’s going rate.

CIOs Under Pressure

IT officers are getting more efficient, but guess what keeps them up at night?

Ever-present security concerns are keeping utility chief information officers up at night. With their IT budgets under constraints in a back-to-basics era, four CIOs speak out about their concerns over funding, staffing, and the future.

The Too-Perfect Hedge

Congress gives FERC an impossible task: Craft long-term transmission rights to save native load from paying grid congestion costs.

If “perfect” be the enemy of the “good,” then look no further for proof than in Federal Power Act section 217(b)(4), enacted by Congress in EPACT 2005.